CASE STUDIES New Water Treatment FacilityNew Water Treatment facility in Kent with a combined value of £40Million, MEC Utilities were the key provided of specialist labour to deliver the EC&I element of the project, this involved the installation of 45,000 m of cabling site wide including 3000m of heavy-duty containment site wide.VIEW CASE STUDY → Data CentreAn existing, operational data centre with three generator halls in use, 2 generators in each room and one lying fallow was to be enhanced with further power requirements. Each of the existing rooms was to have a third generator incorporated into the existing system and the fallow room was to be equipped with three generators to provide back-up power to a newly commissioned data hall.VIEW CASE STUDY → Water treatment upgrade Upgrade to an existing water treatment facility in maidenhead to ensure operational output in the summer period.Full integration into the existing plant programmed around planned outages with our client to ensure minimal disruption to the supply network.VIEW CASE STUDY → CONTACT US CONTACT